Raw Material Usage Standard in Press Shop

Hi,

I need help to set the raw material (steel coil) usage standards for Press Shop which consist of two different processes which is the blanking process and stamping process. What kind of indicator such as weight per unit, weight per model or any indicator that most companies being using and how to know if the production produced more than needed? Does anyone have any experience to do that?

Please help.

Thanks!

I didn’t find the right solution from the Internet.

References:http://www.engineersedge.com/engineering-forum/showthread.php/5037-Raw-Material-Usage-Standard-in-Press-Shop?s=8de2168305849c0a316b8b227b21d0e4

mobile app explainer